
Deer Trail serves as the focal point of this late-1960s survey, situated along the Union Pacific rail line as it cuts through the Eastern Plains. The landscape is defined by the braided channels of East Bijou Creek, Middle Bijou Creek, and Key Creek, which carve through the high plains terrain. Local life is anchored by civic features such as the Evergreen Cem and the Rodeo Ground on the outskirts of the settlement.
The map records the transition from traditional land uses to modern infrastructure, showing numerous Gravel Pits and the path of a major Pipeline alongside the established drainage patterns of Hay Gulch and Willow Gulch. The boundary between Arapahoe Co and Elbert Co is clearly delineated, crossing the creek beds in the southern portion of the quadrangle. Researchers will find a mix of agricultural signatures, from Storage Bins to a highway Rest Area, illustrating the corridor's role as a transit and supply hub.
20 named features on this map. Tap any name to fly to it.
Don’t see what you’re looking for? This feature index may not catch every label — zoom into the map to look around manually.
This is the sole edition of this map. No revisions or reprints were ever made.
1891 · Limon
USGS Topo · 1:125,000
1892 · Limon
USGS Topo · 1:125,000
1953 · Denver
USGS Topo · 1:250,000
1954 · Limon
USGS Topo · 1:250,000
1956 · Peoria
USGS Topo · 1:24,000
1956 · Byers
USGS Topo · 1:24,000
1957 · Denver
USGS Topo · 1:250,000
1957 · Limon
USGS Topo · 1:250,000
1958 · Limon
USGS Topo · 1:250,000
1958 · Denver
USGS Topo · 1:250,000