The Everglades define the landscape of this 2018 survey, reflecting the hydrological management of south Florida. The territory is dominated by the diagonal path of the Hillsboro Canal, a major piece of drainage infrastructure that historically shaped land use in Palm Beach County. Paralleling this waterway, Co Hwy 827 provides a primary transit corridor through the wetlands and agricultural tracts. The map illustrates a highly engineered environment where smaller works like the B-7 Canal intersect the broader marshes. This sheet captures a sparsely populated region where human activity is focused almost entirely on water control and the maintenance of the arterial roadway through the marshy terrain.
4 named features on this map. Tap any name to fly to it.
Don’t see what you’re looking for? This feature index may not catch every label — zoom into the map to look around manually.
This is the sole edition of this map. No revisions or reprints were ever made.
1956 · West Palm Beach
USGS Topo · 1:250,000
1957 · West Palm Beach
USGS Topo · 1:250,000
1958 · West Palm Beach
USGS Topo · 1:250,000
1963 · Fort Lauderdale 2 SE
USGS Topo · 1:24,000
1970 · Loxahatchee SE
USGS Topo · 1:24,000
1970 · Loxahatchee SW
USGS Topo · 1:24,000
1970 · Shawano
USGS Topo · 1:24,000
1973 · Fort Lauderdale 2 NE
USGS Topo · 1:24,000
1973 · Fort Lauderdale 2 SW
USGS Topo · 1:24,000
1974 · Everglades 1 SE
USGS Topo · 1:24,000