The Everglades dominate this landscape, illustrating the vast marshland and water management infrastructure of western Palm Beach County in the early 2020s. The area is characterized by a precise geometric grid of drainage and irrigation, essential to the agricultural operations that border the natural wetlands. The Hillsboro Canal serves as the primary hydrological artery, cutting a sharp diagonal across the sheet. It is joined by the L-7 Canal, forming a critical junction for water control. Transport is limited to the perimeter and levee roads, most notably Co HWY 827, which follows the canal's path. This map provides a clear view of the modern engineered environment where the remaining wilderness meets large-scale water diversion projects.
5 named features on this map. Tap any name to fly to it.
Don’t see what you’re looking for? This feature index may not catch every label — zoom into the map to look around manually.
This is the sole edition of this map. No revisions or reprints were ever made.
1956 · West Palm Beach
USGS Topo · 1:250,000
1957 · West Palm Beach
USGS Topo · 1:250,000
1958 · West Palm Beach
USGS Topo · 1:250,000
1963 · Fort Lauderdale 2 SE
USGS Topo · 1:24,000
1970 · Loxahatchee SE
USGS Topo · 1:24,000
1970 · Loxahatchee SW
USGS Topo · 1:24,000
1970 · Shawano
USGS Topo · 1:24,000
1973 · Fort Lauderdale 2 NE
USGS Topo · 1:24,000
1973 · Fort Lauderdale 2 SW
USGS Topo · 1:24,000
1974 · Everglades 1 SE
USGS Topo · 1:24,000